Yes,
• Mark all sprinkler heads with flags or stakes.
• Water 48hrs before service, but do NOT water within 24hrs or less from service day.
• Cut lawn 1-2 levels lower than normal, but do not scalp yard.
• Dethatching before aeration is not required but can improve overall results.